Airport Master Plan
The first Master Plan for the Georgetown Municipal Airport was done in 1980, and a second Master Plan for the Airport was conducted in 1998. The Master Plan is a long-range plan to guide current and future activity at the Airport. The closures of Mueller Airport in Austin and Austin Executive Airpark in Pflugerville, which both occurred in 1999, had a major impact on general aviation demand in Central Texas.
In October 2003, the City Council voted to update the 1998 Airport Master Plan due to regional changes in general aviation facilities and demand, as well as local concerns about increased operations. The Master Plan update addresses current airport conditions, regional aviation trends, adjacent land uses, zoning, facility requirements, airport layout plans, aviation demand forecasts, noise issues, financial projections, economic impacts, and minimum standards for airport usage. The update provides a 20-year (2003 – 2023) long-range plan.
City of Georgetown Municipal Airport Master Plan Update
Below is a copy of the Georgetown Municipal Airport Master Plan Update accepted by City Council on Tuesday July 26, 2005.
*Please note a few of the .pdf files listed below are very large files. It is possible those files will not open in your browser, depending upon your system settings, broadband connection, etc. To address this, you can “right-click” on the link, choose “Save Target As” and save the .pdf to your desktop. Once the file is downloaded to your computer, the document should open easily within Adobe Acrobat 5.0 or higher.
Additionally, for the ease of download, the sections have been listed below in two formats. Complete Sections, which include the exhibits, are shown in the first list. For those with slower connection speeds, text-only sections are listed underneath, with exhibits saved out into separate .pdf files.
If you would like a copy of this document on a CD, please contact City Hall at 512/930-8486 or rrye@georgetowntx.org. There is a $5.50 charge to obtain a CD.
- Front Cover (1.5M .pdf)
- Table of Contents (54K .pdf)
- Table of Exhibits (44K .pdf)
- Table of Tables (45K .pdf)
- Sections – Complete
- Section One – Inventory (10M .pdf)
- Section Two – Activity Forecasts (149K .pdf)
- Section Three – Future Facility Requirements (9M .pdf)
- Section Four – Airport Development Plans (27M .pdf)
- Section Five – Rules and Regulations and Minimum Standards (37K .pdf)
- Section Six – Noise Strategies (105M .pdf)
- Sections – Text Only (Exhibits Listed Separately)
- Section One – Inventory (126K .pdf)
- Section Two – Activity Forecasts (415K .pdf)
- Section Three – Future Facility Requirements (192K .pdf)
- Section Four – Airport Development Plans (163K .pdf)
- Section Five – Rules and Regulations and Minimum Standards (38K .pdf)
- Section Six – Noise Strategies (150K .pdf)
- Exhibits
- Exhibit 1-1 (397K .pdf)
- Exhibit 1-2 (9M .pdf)
- Exhibit 1-3 (223K .pdf)
- Exhibit 1-4 (60K .pdf)
- Exhibit 3-1 (9M .pdf)
- Exhibit 4-1 (9M .pdf)
- Exhibit 4-2 (9M .pdf)
- Exhibit 4-3 (9M .pdf)
- Exhibit 4-4 (538K .pdf)
- Exhibit 6-1 (178K .pdf)
- Exhibit 6-2 (153K .pdf)
- Exhibit 6-3 (140K .pdf)
- Exhibit 6-4 (5M .pdf)
- Exhibit 6-5 (5M .pdf)
- Exhibit 6-6 (5M .pdf)
- Exhibit 6-7 (5M .pdf)
- Exhibit 6-8 (5M .pdf)
- Exhibit 6-9 (5M .pdf)
- Exhibit 6-10 (5M .pdf)
- Exhibit 6-11 (5M .pdf)
- Exhibit 6-12 (5M .pdf)
- Exhibit 6-13 (5M .pdf)
- Exhibit 6-14 (5M .pdf)
- Exhibit 6-15 (5M .pdf)
- Exhibit 6-16 (5M .pdf)
- Exhibit 6-17 (5M .pdf)
- Exhibit 6-18 (5M .pdf)
- Exhibit 6-19 (5M .pdf)
- Exhibit 6-20 (5M .pdf)
- Exhibit 6-21 (178K .pdf)
- Exhibit 6-22 (158K .pdf)
- Exhibit 6-23 (5M .pdf)
- Exhibit 6-24 (5M .pdf)
- Exhibit 6-25 (5M .pdf)
- Appendices
- Appendix “A” – Summary of Aircraft Owners / Pilots Survey
- Appendix “B” – 1994 and 1998 Water Quality Control Plans
- Appendix “C” – Airport Layout Plan
- Appendix “D” – INM Noise Echo Reports
- Appendix “E” – Economic Impact Analysis
- Appendix “F” – TxDOT Economic Impact Study and a List of Surveyed Firms
- Back Cover
Posted in Airport, Master Plans